RRR Hyderabad Route Map 2026: Complete Alignment Guide with GPS Coordinates
Track the exact 340 KM alignment of the Regional Ring Road across 6 districts with 50+ interchange locations.
Northern Corridor (164 KM)
Sangareddy → Narsapur → Toopran → Gajwel → Bhongir → Choutuppal
This corridor passes through Sangareddy, Medak, Siddipet, and Yadadri-Bhuvanagiri districts. Construction is already underway with land acquisition at 85%.
Southern Corridor (182 KM)
Choutuppal → Ibrahimpatnam → Kandukur → Amangal → Chevella → Shankarpally → Sangareddy
This corridor passes through Nalgonda and Ranga Reddy districts. DPR preparation is at 75% with construction expected to start in 2026.
50+ Interchange Locations
🟦 Sangareddy
Start Point | NH 65 Junction
🟦 Narsapur
Medak District | NH 44
🟦 Toopran
Medak District | SH 15
🟦 Gajwel
Siddipet District | SH 1
🟦 Bhongir
Yadadri District | NH 163
🟦 Choutuppal
Nalgonda District | NH 65
🟦 Ibrahimpatnam
Ranga Reddy | SH 19
🟦 Amangal
Ranga Reddy | SH 4
🟦 Chevella
Ranga Reddy | NH 765
🟦 Shankarpally
Ranga Reddy | NH 44
GPS Coordinates of Key Junctions
- Sangareddy: 17.6295° N, 78.0917° E
- Choutuppal: 17.3880° N, 78.9985° E
- Amangal: 17.0120° N, 78.2825° E
- Chevella: 17.1970° N, 77.8865° E
- Bhongir: 17.5140° N, 79.0890° E
